Elastic Path Production Tools

Linked Category

Linked Category





The Linked Category's associated Master Category must exist on the production system before it can be synchronized. You must either:

  • Add the Master Category to a separate change set and sync that change set first.
  • Add the Master Category to the same change set as the Linked Category and sync them both at the same time.