Announcement: You can find the guides for Commerce 7.5 and later on the new Elastic Path Documentation site. The Developer Center continues to support Commerce 6.13.0 through 7.4.1.Visit new site

Base Price

Base Price





The Base Price's associated Price List must exist on the live system before it can be synchronized. You must either:

  • Add the Price List in a separate change set and sync that change set first.
  • Add the Price List to the same change set as the Base Price and sync them both at the same time.